A
Accept
A response to a project risk where the project manager accepts the risk and takes no action to evade it, i.e. 'accepting' the risk. This is usually in case of risks that are unlikely to occur or minor enough so as to not affect the project's outcome.
Acceptance Criteria
A set of formal requirements that a project must pass before it can be accepted by the project sponsors.
Acceptance Test
A process through which a project's end users run through the project to identify any potential issues before it can be formally accepted.
Accrual Work Done
Work that has been done but hasn't been paid for.
Acquisition Process
The process for acquiring the resources and people needed to complete a project.
Action Item
An activity that must be completed for the project to move forward.
Action Item Status
The current status of an Action Item.
Activity
A distinct, identifiable portion of work done during the course of a project. Each 'activity' is the smallest unit of work that can be performed within the scope of the project.
Activity Duration
The total length of time it takes to complete an activity from start to finish.
Activity ID
An alphanumeric code used to identify an activity.
Activity List
A list of all the activities that make up a project. Together, these activities make up the complete scope of the project.
Activity Network
A network diagram that shows all the activities in a project along with their dependencies. Activity Network is also called a Network Diagram.
Actual Cost of Work Performed
The total cost of work performed during any given period of time.
Actual Dates
The actual date on which any activity starts or ends. Actual dates are different from planned or estimated dates.
Actual Duration
The actual time spent on an activity from start to finish. Actual Duration is a function of the activity's Actual Start and Actual Finish dates.
Actual Effort
The actual effort spent to complete the activity, as opposed to the planned or estimated effort.
Actual Expenditure
The actual expenditure spent to complete the activity, as opposed to the planned or estimated expenditure.
Actual Finish
The actual date on which an activity ends, as opposed to the planned or estimated finish date
Actual Progress
The actual current progress of the project compared to the estimated project baselines. Actual Progress is expressed as a percentage and indicates whether the project is performing over/under original estimates.
Actual Start
The actual date on which an activity starts, as opposed to the planned or estimated start date
Actual Time Expended
The actual time spent on an activity from the Actual Start to the present date.
Adaptive Project Framework (APF)
An alternate approach to project management that focuses on estimating project work in stages based on changing business environment. APF is the opposite of the traditional top-down waterfall planning method and prioritizes flexibility and adaptability.
Administrative Closure
A list of the requirements necessary to formally close the project.
Adoption
In the life cycle of a project, Adoption is the phase where the project's deliverables are put to use and their benefits realized.
Advantage
a factor or circumstance of benefit to its possessor
Aggregate Planning
A technique for estimating resource and personnel requirements for the next 3 to 18 months based on demand forecasts.
Agile
A project management methodology that focuses on delivering work in an iterative fashion. All work is divided into short bursts called "sprints". The agile approach is usually used in software projects where the scope is not always known and adaptability is prioritized
Agile Project Management
A project management approach that uses the Agile methodology with a focus on iteration, flexibility, and adaptability.
Alliancing
Another term for 'Partnering', Alliancing is where two or more organizations work together to manage a contract.
Allocation
Another term for Resource Allocation. Allocation describes the process for assigning resources for different project activities in the most efficient way possible.
Alternate Dispute Resolution
Alternate Dispute Resolution (ADR) is the process of settling disputes outside courts through various avenues such as arbitration and mediation, etc.
Analogous Estimating
Analogous estimating, describes a technique for estimating the cost or duration of an activity or project based on historical data from similar activities or projects
Analytical Estimating
A technique for estimating the cost and/or duration of a project by estimating the cost and/or duration of every activity that constitutes the project and adding them together. Analytical estimating is often used alongside Analogous estimating to arrive at the true cost/duration of a project.
Approach Analysis
A technique to analyze the various methods that can be used to meet the project's goals. Approach Analysis is used during the Planning phase of each project.
Arrow Diagramming Method (ADM)
A technique for creating network diagrams. Each activity is represented with arrows. Events and milestones are represented as nodes.
As Late as Possible (ALAP)
In project management terms, ALAP is any activity that should be started as late as possible as long as it doesn't delay any of its successor activities. Activities are classified as ALAP if they have to wait on other deliverables or activities before they can begin.
As Soon as Possible (ASAP)
In project management terms, ASAP is any activity for which the start date is as soon as possible. By default, every activity in a project is considered ASAP.
Assignment Contouring
This describes a process for changing the number of hours of work assigned to each person on the project as the project moves through different stages. Thus, instead of a fixed number of hours per day, a person might work for a variable number of hours on the project through Assignment Contouring.
Assumption
Anything assumed to be true - without sufficient evidence - during the planning phase of a project. Assumptions are a major contributor to Project Risk, A large number of assumptions increase the overall Project Risk.
Audit
The process of analyzing a project to ensure that it is being governed as intended. A project sponsor can request an audit. A project team might also go through an audit to ensure that there are no lapses in project management.
Authorization
Authorization is the power to make decisions. A project might have several levels of authorization for different activities or deliverables.
Authorization Points
Specific points during the course of a project at which the sponsor reviews the business case and approves the project onwards.
Authorized Work
Work that has been approved by someone with direct authorization over the activity, deliverable, or project.
Avoid
A response to a project risk that seeks to eliminate its occurrence or mitigate its impact on the project
B
Background
narrative explanation detailing why the project is being undertaken
Backward Pass
A technique used in Critical Path Method (CPM) to calculate the late start and late finish dates by working backwards from the project end date.
Balance
Balance describes a phase in a portfolio life cycle where all constituents of the portfolio are balanced in terms of resource use, risks, and costs.
Balanced Matrix
An organizational structure where functional managers and project managers have the same priority.
Bar Chart
A chart that shows the planned start and end dates of all the activities in a project in a logical order.
Base Date
A date that serves as the reference (or 'base') for the start of a project calendar.
Baseline
The baseline is the combination of costs and schedules fixed at the start of a project. The Actual Progress of the project is compared to the baseline. Setting the baseline is crucial for benchmarking the project.
Baseline Costs
The baseline cost is the estimated cost of a project or activity when the project is first planned or baselined.
Baseline Dates
The planned dates a project or activity is estimated to last when the project is first baselined.
Baseline Plan
The original project plan against which all project performance is measured.
Baseline Schedule
The planned schedule of different activities in a project. This is the schedule against which project progress is measured.
Benchmarking
The process of surveying similar organizations running similar projects (or relying on external surveys) to arrive at the standard or baseline for the project. These standards serve as the 'benchmark' against which performance can be measured.
Beneficiaries
a person or thing that receives help or an advantage from something : one that benefits from something
Benefit
an advantage or profit gained from something.
Benefits Framework
This defines the expected benefits of the project, the specific operations it would affect, and how the project's performance would be; a) realized, and b) measured.
Benefits Management
The process of identifying the benefits of a project, defining their scope, tracking their intended performance, and ensuring that they are fully realized by end users.
Benefits Realization
The process of ensuring that the project's end users and stakeholders derive the expected benefits from the project.
Blueprint
A project blueprint defines the scope of the project, the business goals it is meant to achieve, and the broader vision behind it.
Bottleneck
In project management terms, a bottleneck is any constraint that restricts the movement of a process.
Bottom-up Estimating
Another term for Analytical Estimating. With this approach, the project's cost and/or duration are calculated by adding the cost/duration of all its constituent activities.
Breakdown Structure
A hierarchical structure for decomposing the elements of any entity, usually from "broad" to "narrow" in scope. While Breakdown Structure can refer to Cost Breakdown Structure or Organizational Breakdown Structure, in project management, it usually refers to Work Breakdown Structure (CBS)
Brief
Also called a Creative Brief, this document outlines the core requirements of the project while it is still being conceptualized. Besides requirements, the brief usually also offers a background of the project, its sponsors, and its business case.
Budget
The sum total of all the money allocated for a project.
Budget at Completion (BAC)
BAC is the sum total of all budgets established for the work to be performed.
Budget Cost
The cost of the project estimated at the start of the project. Note that the budget cost is not the same as the budget. The latter defines the money allocated for the project, while budget cost is the cost of the project.
Budgeted Cost of Work Performed (BCWP)
BCWP defines the total cost of actual work completed to date.
Budgeted Cost of Work Scheduled (BCWS)
BCWS defines the total cost of work scheduled to date. BCWS is considered the baseline and the budget performance is measured against it.
Buffer
In project management terms, buffer is the additional time included in a project schedule to account for any unexpected delays.
Build (stage)
In project scheduling, 'Build' is the period when resources actually build or create the deliverable.
Business Case
The business case of a project is the reason for its existence. This document briefly lists the need for the project, its core uses, and its primary benefits.
Business Objectives
The objectives of the business associated with the project. Note that business objectives are not necessarily the same as the project objectives, though the two are aligned.
Business Process Modeling (BPM)
The process of defining, detailing, and analyzing business processes in an attempt to improve them.
Business Requirements
A list of requirements necessary for the project to fulfill the Business Case and be actually beneficial to the business.
C
Calendar Unit
In a project calendar, the calendar unit is the smallest unit of time by which project duration is measured. In most projects, this unit is 'hour'. In very long or broadly defined projects, the unit can also be 'days'.
Calendars
Usually refers to the Project Calendar, which is a regular calendar showing the schedule of project activities. Projects might additional calendars as well to show resource availability, communication cadence, etc.
Capability
In project management terms, capability refers to the ability to realize a specific outcome. If you have an in-house design team, for instance, you can say that you have "design capability".
CAPEX
CAPEX stands for Capital Expenditure. CAPEX is any money spent by an organization in acquiring and/or upgrading capital-intensive assets.
Certified Associate in Project Management (CAPM)
A certificate in project management basics offered by Project Management Institute (PMI). A CAPM is often a basic requirement for project management roles.
Challenge
a task or situation that tests someone's abilities.
Champion
An informal term for any individual who 'champions' the project and helps it succeed by working intensively with stakeholders and project teams.
Change
Any alteration to the project's scope, deadlines, or deliverables is classified as 'Change'. While minor changes need not be recorded, any substantive change to the project should be documented as a formal Change Request.
Change Authority
The authority (an individual or a group of individuals) who can authorize a change request in a project.
Change Control
The process of documenting, approving and rejecting changes to specific deliverables, deadlines, scope, and benchmarks for a project.
Change Control Board
A formal body within a project management organizational structure tasked with managing project change. All decisions about reviewing, approving, and rejecting changes to a project are handled by the Change Control Board.
Change Control System
A formal system for managing changes to a project's deliverables, deadlines, and scope.
Change Freeze
The point in a project beyond which change requests cannot be entertained.
Change Log
A formal log documenting all the change requests associated with a project.
Change Request
In project management terms, a Change Request is a formal request to change an aspect of the project, such as the list of deliverables, deadlines, or overall project scope.
Channel
a medium for communication or the passage of information. "they didn't apply through the proper channels"
Charter
Also called the 'Project Charter', this document outlines all the relationships within stakeholders and project team members. It also identifies decision making hierarchies and key authorities over different project areas.
Client Brief
Also called a 'Creative Brief', the Client Brief is an initial outline of the project's core requirements, background, and business case. The Client Brief is instrumental for kicking off the project.
Closeout
Also called 'Project Handover', this is the phase when the project is finalized, all deliverables are formally handed over, and the project team is debriefed.
Closure
The formal term for the end of a project.
Code of Accounts
The formal numbering system used for individual components of a Work Breakdown Structure.
Collaboration
the action of working with someone to produce or create something.
Communication
Any communication sent to a stakeholder in a formal capacity.
Communication Plan
A document outlining the communication strategy for the project, including all stakeholders and their relationship to the project. The communication plan formally lists what is to be communicated, to whom, through which mediums, and at what intervals.
Communications Management Plan
A formal plan that identifies project stakeholders, their preferred communication channels, and what information must be relayed to them at what time.
Completion Date
The estimated date for the project's end, based on initial planning and current progress.
Conflict Management
The process of managing conflicts between team members, and between team members and project stakeholders.
Conflict Resolution
The process of identifying, addressing, and resolving conflicts between team members and project stakeholders. Conflict resolution is a part of the conflict management plan.
Constraint
In project management terms, a constraint is any factor that limits how the project can be managed. Thus, a project with a limited budget would be said to have a "budget constraint".
Consumable Resource
Any resource that is only available until it is consumed. A sheet of paper, for instance, is a 'consumable resource' since it won't be available once it has been used. In contrast, a designer is not a consumable resource since they would be available as long as they are employed by the company.
Context
the interrelated conditions in which something exists or occurs
Contingency Plan
A formal plan that details the evasive actions that can be taken in the event of a contingency.
Contingency Reserve
Additional resources (time as well as money) allocated in the project schedule to tackle a probable contingency. Contingency Reserves are commonly used for projects with known risks.
Control
The process of controlling the project by tracking performance and taking actions to align it with project baselines and intended outcomes.
Corrective Action
A formal action to realign a project's performance and activities with the original project plan.
Cost Baseline
The sum total of approved cost estimates and contingency reserves that serves as the baseline for measuring the project's financial performance.
Cost Breakdown Structure (CBS)
A hierarchical organization of the project's budgeted costs. The CBS essentially documents the costs associated with each component of a Work Breakdown Structure (WBS). Thus, its structure mirrors that of the WBS.
Cost Management Plan
A formal plan that identifies and documents the process of tracking, managing, and controlling project costs.
Cost Performance Index (CPI)
The ratio of Earned Value (EV) and Actual Cost of a project. CPI is an important measure that helps project teams track the cost efficiency of budgeted resources.
Cost Variance (CV)
Cost Variance is the difference between the Earned Value and Actual Cost of the project. If this difference is positive, the project is said to run a budget surplus. Else, the project has a budget deficit.
Cost-benefit Analysis
The process of analyzing all the costs associated with a project (both initial and recurring) and the benefits to be gained from it over the short, medium, and long-term.
Cost-time Resource Sheet (CTR)
This document describes individual elements in the Work Breakdown Structure, including their resource requirements, estimated costs, and delivery timelines.
Costs
Comments
Crashing
A way to fast track the project by adding resources. Crashing is only used in emergencies or if there are surplus resources available.
Credits
recognition by name of a person contributing to a performance (such as a film or telecast)
Critical Chain Method
A method for scheduling projects with uncertain deadlines and limited resources. In the Critical Chain Method, project managers rely on placing buffers on project schedule paths to make room for unexpected contingencies.
Critical Path
In CPM, the Critical Path identifies the longest path through the project's activities. The combined duration of all activities along this path gives you the minimum duration of the project.
Critical Path Activity
Any activity that lies on the Critical Path of a project schedule.
Critical Path Method
Also called Critical Path Analysis, CPM is an algorithm for scheduling project activities. CPM involves identifying the most important (or "critical") activities necessary to complete the project (i.e. its "critical path"). Estimating the duration of these activities can make it easier to estimate the project's minimum duration.
Current Finish Date
A current, up-to-date estimate of an activity's completion date
Current Start Date
A current, up-to-date estimate of an activity's start date.
E
Early Finish Date
As the name implies, this is the earliest date by which a project activity can logically finish.
Early Start Date
The opposite of Early Finish Date - the earliest date by which a project activity can logically start.
Earned Schedule (ES)
Also called Earned Schedule Theory, this is an extension of Earned Value Management (see below) that provides a time component to EVM, instead of just cost. ES is used for schedule analysis and makes it easier to improve both cost and schedule prediction.
Earned Value (EV)
Earned Value is a measure of the percent of total budget actually completed (i.e. finished work) at any point in time. Another term for EV is Budgeted Cost of Work Performed (BCWP) - see above.
Earned Value Management
EVM is a project management technique for measuring project performance. EVM is based on comparing work planned (i.e. Planned Value) and work performed (i.e. Earned Value). EVM is a core skill for project managers and is widely deployed in projects across industries.
Effort
Effort is a measure of the total amount of labor (usually measured in hours) necessary to complete a task.
Effort Estimate
An estimate of the amount of Effort (usually calculated in hours) necessary to complete an activity. Effort estimates are based on historical project data, industry standards, and past resource performance.
Effort Management
The process of managing resource effort efficiently by allocating the right resource to the right activities in the project.
Elapsed Time
From any given date, elapsed time is the total number of calendar days (minus weekends and holidays) necessary to complete any activity.
Emergent Change
Any unplanned change that is managed by using undocumented approaches.
End-User
The final users of the project's output. All project decisions should factor in the needs of the end users.
Enhancement, Management, and Upgrade (EMU)
A way to categorize projects, especially in the IT industry. Projects categorized as 'Enhancement' are focused on improving the performance or capabilities of an existing product. 'Management' projects are focused on maintaining an existing product. And 'Upgrade' projects focus on upgrading a product to a better version, usually after adding new features.
Enterprise Environmental Factors
Any factors that can impact project performance but are not under direct control of the project team. These factors can range from the expected (such as interdepartmental conflict within the enterprise) and the unpredictable (such as a bad weather event delaying decision-making for a key deliverable).
Enterprise Modeling
The process of modeling the structure, capabilities, practices, and processes of an organization to better understand its functioning. Enterprise modeling is used both to improve an organization's functioning, and to understand its quirks for better project delivery.
Enterprise Project Management Office (EPMO)
A dedicated department within an organization that's responsible for the governance of projects, programs, and portfolios across the organization.
Equity
Comments
Escalation
Escalation is the process of bringing issues to the attention of a higher authority.
Estimate at Completion (EAC)
The sum of the project's actual cost (i.e. cost of work performed - ACWP) and estimated cost at completion (ETC).
Estimate to Complete (ETC)
A project's ETC is an estimated cost of all the project work that needs to be completed.
Estimated Completion Date
the estimated date the work will be completed
Estimated Cost
estimated costs to complete the work
Estimated Duration
estimated timeframe it will take to complete the work
Estimated Timeframe
Comments
Estimation
The process of approximating unknown quantities (such as activity finish date or costs) by using formal estimation techniques.
Event
something that happens : OCCURRENCE
Event Chain Diagram
A visualization of project events and how they affect each other. An event chain diagram maps both project risks and project events to identify opportunities as well as threats. Event chain diagrams are used in event chain methodology to manage project schedule and control risk.
Event Chain Methodology
A network analysis technique that uses event chains, i.e. events and the relationships between them, to manage project schedules and mitigate project risk.
Exceptions
Any event that causes a deviation from the plan, such as an unexpected change request or project risk.
Execution Phase
The extended phase after project initiation, conception, and planning where the actual project execution takes phase. As far as project delivery is concerned, this is the most important phase in the project lifecycle.
Expediting
The process of accelerating the progress of an activity by removing any obstacles (organizational, financial, or even physical) to its completion. For instance, if you pay extra for faster shipping of a key project component, you are "expediting" its procurement.
External
Comments
External Constraint
Any outside factor that hampers the progress of the project or activity.
External Deliverable
Comments
External Dependency
Any factor that lies outside the organization and that can affect the outcome of the project or activity.
External Suppliers
A third party supplier responsible for a key input for any project deliverable. This includes suppliers of physical goods as well as talent.
F
Facility
In project management terms, 'facility' is the final outcome of a project, or its completed key deliverable.
Factors
Any event that affects the outcome of a project activity, whether external or internal.
Fallback Plan
The Plan B in case of a risk event, provided the primary contingency plan ('Plan A') fails.
Fast Tracking
A technique to reduce the duration of a project by completing some activities on the critical path concurrently instead of consecutively.
Feasibility Study
A process to evaluate the feasibility of the project before initiation. The feasibility study takes into account project requirements, enterprise environmental factors, budget constraints, resource constraints, and key project risks.
Final Account
The account that's responsible for finally closing a contract.
Financial Plan
Comments
Finish-to-Finish
In Gantt Charts, a Finish-to-Finish relationship means that any successor activity cannot finish before the predecessor activity has finished.
Finish-to-Finish Lag
The minimum time gap between the finish of one activity and finish of its successor.
Finish-to-Start
In a Finish-to-Start relationship, any successor activity cannot start before the predecessor activity has finished.
Finish-to-Start Lag
The minimum time gap between the finish of one activity and the start of its successor.
Fishbone Diagram
Also called Ishikawa Diagram, a fishbone diagram helps map the various causes of an (usually) undesirable effect. It is called so since the central spine of the effect and the various causes responsible for it resemble a fish skeleton.
Fixed Cost
Any cost that does not depend on the volume of the resource consumed. For example, the cost of buying a computer remains the same, no matter if you use it for 20 hours or 1 hour. Hence, it is a fixed cost.
Fixed Formula Method
A technique used in Earned Value Management (EVM) to calculate Earned Value (EV). With the Fixed Formula Method, a fixed percentage of the EV is unlocked when a work package starts. The rest of the EV unlocks only when the work package ends. There is no unlocking of EV while the work package is actually ongoing.
Fixed Units
If the amount of resource units (typically calculated in hours) for a task is fixed, it is said to be 'Fixed Units'.
Fixed Work
If the amount of effort (work) for a task is fixed, i.e., it can't go beyond the specified amount, it is said to be 'Fixed Work'.
Flow Diagram
A visual representation of work elements and the logical relationship between them, without factoring in the timescale. A flow diagram maps the work packages that need to be completed, not their duration.
Flowchart
A visual representation of any sequence of steps in any process.
Forecast
In project management terms, a forecast is an approximation of a project, activity, or deliverable's cost and budget schedule based on current and historical data.
Forward Pass
In the Critical Path Method, forward pass is a tactic for calculating the early start and early finish dates by working forward through the critical path from any given point in time.
Free Float
Free Float refers to the maximum amount of time by which an activity can be postponed without affecting the early start of any successor activities.
Function
Within an organization, a 'function' refers to any specialist department. Accounting, sales, marketing, IT, etc. are all examples of organizational 'functions'.
Functional Manager
In a functional organization, a functional manager is any manager heading a specialist department. A sales manager, thus, would be a 'functional manager'.
Functional Organization (Structure)
An organizational structure where different parts of the organization are grouped together by function or specialization, such as accounting, sales, marketing, etc. In functional organizations, project managers have limited power and must look to functional managers for budgets and approvals.
Functional Requirements
The key requirements that must be met for a product to be usable (i.e., "functional") to end users.
Funding
The process of seeking and securing the budget necessary for undertaking any project.
Future State
The 'Future State' defines the changes in a project or organization after undertaking certain improvements.
I
Idea Development
The process of fleshing out any identified opportunities to identify their strengths, weaknesses, and consequences.
Impact
In project management terms, 'impact' is the evaluation of the effect of a risk on the project's outcome. Impact is typically categorized as 'high', 'moderate', or 'low' based on how negatively the risk event would impact the project's final results.
Impact Analysis
The process of evaluating the impact of a risk event on a project, as well as the impact of a chosen remedial course of action.
Impact Charter
Comments
Impact Hypothesis
a tool used to create a differentiation between projects, goals, and how we’re measuring success
Implementation Phase
The phase in the project life cycle where the project plan is executed.
Implementation Strategy
Comments
Inclusion
Comments
Information Distribution
In project management terms, "information distribution" refers to the channels that are used to convey key project information to stakeholders.
Initiation Phase
A phase in the project life cycle that formally marks the beginning of the project. At the Initiation Phase, the project moves from conception towards reality. The project plan, kickoff, and key project documents are created in the Initiation Phase.
Innovation
Comments
Inputs
Key information or materials necessary for implementing a proposed solution in the project.
Insight
Comments
Inspection
Inspection' refers to the final phase of examining, testing, and reviewing the project's output before it can be formally handed over to the end users.
Integrated Change Control
A project change rarely exists in isolation. Usually, it affects every aspect of the project, from its overall scope and schedule to final budget and resource requirements. Integrated change control is the process of coordinating and controlling changes across all these aspects of the project.
Integrated Master Plan (IMP)
An event-driven project management plan that documents the tasks necessary to complete any project and ties them to project events. IMP is often used by the US Department of Defense and is particularly useful for planning large projects with expansive resource requirements.
Integrated Master Schedule (IMS)
The Integrated Master Schedule is the end-result of an Integrated Master Plan. This schedule represents all the tasks necessary to complete the project as a time-bound network schedule.
Integration Management Plan
This plan documents the project's approach to integration planning and change management.
Integration Planning
The process of integrating all the discrete parts of the project. Integration Planning also includes managing and integrating any changes in the project's scope, schedule, or budget.
Interdependencies
The interdependencies between projects in portfolio or program management.
Internal Deliverable
Comments
Internal Stakeholder
a person with an interest or concern in something, especially a business. • [as modifier] denoting a type of organization or system in which all the members or participants are seen as having an interest in its success: a stakeholder economy.
Ishikawa Diagram
Another name for 'fishbone diagram'. The Ishikawa diagram is used to map an effect and its root causes.
Issue
An 'issue' in project management is any hurdle that impacts a project activity or even the entire project. The term 'issue' is usually reserved for large or complex problems that cannot be solved by an individual resource alone.
Issue Log
A log of all the issues encountered in a project, as well as their current status, timeline for resolution, and resources responsible for managing them.
Issue Management
The process of identifying, logging, and resolving issues before they can pose a threat to the project.
Issue Register
Another name for issue log - a document listing all the issues encountered during a project, their impact, and the remedial course of action.
Iteration
Iteration, in project management, is the concept of gradually developing an end product over time. In an iterative approach to project management, the project is broken down into small sub-sections ('sprints' in software development) that are bound by time rather than scope. In each section, a part of the end product is developed within the time frame. This approach works best when the requirements are ever-changing and the end product is not completely known.
Iterative Development
The development approach that uses the concept of iteration outlined above. In iterative development, projects are broken down into time-bound sub-sections. At the end of each sub-section, the project's progress is analyzed and remedial steps, if any, are taken in the subsequent sub-section.
O
Objective
The 'objective' of an activity is a short statement defining what the activity is meant to achieve.
Operational Life
The part of the project life cycle where deliverables are handed over to end-users for operations and maintenance. This phase is a part of the extended project life cycle.
Operations (Phase)
The phase of the project where deliverables are handed over and put to use (i.e., made 'operational').
Operations and Maintenance
The post-execution stage of the project where the core activity switches to operating and maintaining the project, usually by the end-user's team.
Operations Management
The process of organizing, optimizing, and managing the operations of an organization. The goal of operations management is to make the business more efficient while minimizing waste and maximizing impact.
Operations Research
Operations Research is the science of using mathematical models and statistical analysis to aid decision making. Large organizations have dedicated Operations Research departments that use scientific methods to guide the organization's operations management.
Opportunity
In project management terms, an 'opportunity' is anything (tangible or otherwise) that can have a positive effect on a project deliverable.
Opportunity Cost
Opportunity cost is the loss of potential gains from all the alternative courses of action compared to your current course of action.
Optimistic Duration
An activity's 'optimistic duration' is the least amount of time it would take to complete the activity. The optimistic duration is the best-case scenario for the activity and is not a realistic estimate.
Optimizing
In any maturity model, 'optimizing' is the fifth and final phase where the project/organization/process is improved by gathering feedback and implementing prioritized changes.
Optioneering
A problem-solving approach that focuses on surveying the entire domain of solutions and offering stakeholders different 'options' to resolve their problems.
Order of Magnitude Estimate
An early estimate of the project's duration and budget, made using historical data. Order of magnitude estimates are usually offered at the project conception stage to give stakeholders a broad understanding of the project's requirements. These are not accurate and should only be taken as a broad estimate, +-50-100 percent of the end figures.
Organization
Any formal collection of individuals with a shared purpose. Organizations can be businesses, charities, associations, etc.
Organization Development
A broad term for all the activities carried out to analyze and improve the organization's performance, prestige, and productivity. Organization development covers operations as well as resource-focused activities such as employee satisfaction, organization culture, etc.
Organizational Breakdown Structure (OBS)
A hierarchical breakdown of all the different units and departments that make up an organization, their activities, and the relationships between them.
Organizational Culture
Organizational culture' defines all the written and unwritten rules that guide any organization's beliefs, attitudes, and behaviors.
Organizational Enabler
Organizational enabler is anything (skills, resources, knowledge, tools, etc.) that helps the organization perform better and achieve its goals faster.
Organizational Planning
The process of defining all the roles, their hierarchical organization, and the relationships between them in an organization.
Organizational Process Assets
The sum total of all the plans, processes, and practices used by an organization, both tangible and intangible. These 'assets' might be written down plans or they might be implicit knowledge gained over time. For knowledge organizations, organizational process assets form the foundation of their competitive advantage.
Organizational Project Management
The process of efficiently managing projects, programs, and portfolios across the organization, especially with regard to the organization's core objectives. The core goal of organizational project management is to ensure that the organization's project activities are aligned with its original objectives.
Organizational Project Management Maturity
A measure of the maturity of the organization's project management approaches. This maturity-level is typically measured using the OPM3 model (Organizational Project Management Maturity Model) where ad-hoc processes are classified as 'immature' and standardized practices are 'mature'.
Organizational Roles
Organizational roles' defines the different roles performed by individuals in a project or organization. Mature organizations have strictly defined roles so as to minimize conflict and wasteful work.
Original Budget
The budget first established at project initiation. The project's financial performance is often measured against the Original Budget.
Original Decision
The overall duration first established at project initiation.
Out-of-Sequence Progress
Any activity that is reported as 'completed' even when its predecessor activities have not completely finished. That is, the activity was finished out of sequence.
Outcome
The end-product of utilizing an output produced through the project's activities. Essentially, outcome is the result of putting the project's deliverables to use, and it can be either positive or negative.
Output
In project management terms, output is the end result of any process or activity.
Overall Change Control
The process of managing change across the project.
Overhead
All the costs incurred in running the organization that can't be tied to any specific project. Rent, electricity, heating bills, etc. are examples of overhead.
Overrun
Any cost incurred beyond the approved budget (usually in fixed fee contracts) is called 'overrun'.
Overview
Comments
Owner
A project's owner is the organization, individual or group of individuals who are primarily responsible for initiating the project, and who will primarily realize its core benefits.
P
P3 Assurance
P3' stands for 'projects, programs, and portfolios'. P3 assurance is satisfying stakeholders that these "3P's" are on track to meet requirements and objectives.
P3 Management
The collective and holistic management of projects, programs, and portfolios.
P3 Management Team
The primary team involved in managing the 3Ps - projects, programs, and portfolios.
Parallel Activities
Any activities that can be done at the same time (i.e., in parallel) are classified as 'parallel activities'.
Parallel Life Cycle
A project life cycle approach where parts of the project are carried out simultaneously.
Parametric Estimating
The process of using historical data to establish relationships between variables, and using this data to create time and budget estimates. For example, if you use historical data to deduce the time and money required to construct 1 sqft of a house, you can use it to estimate the cost of building a 2,500 sq ft house.
Pareto Diagram/Chart
A type of combination bar and line graph. The bars are arranged vertically and represent the individual values of the described variable in descending order. The line graph, overlaid on top of the vertical bars, shows the cumulative sum of the variable.
Partnering
Partnering, as opposed to a legal 'partnership', is the act of working with another organization to jointly work on a contract. Partnering is not the same as 'partnership' which implies a legal alliance, instead of just an ad-hoc, project-specific alliance.
Path Convergence
Path divergence occurs in a network diagram when an activity has more than one successors. That is, it's a point where multiple project paths diverge.
Path Divergence
Path convergence occurs in a network diagram when an activity has more than one predecessor. That is, it's a point where multiple paths converge.
Payback
In project management terms, 'payback' is the amount of time required to earn back the initial investment from an asset. Say, if you bought a printer for $365 and sell $1 worth of prints every day, you would have a 'payback period' of 365 days.
Percent Complete
The amount of work completed of an activity in relation to the total amount of work to be done at any point in time, expressed as a percent.
Performance
Performance, in project management terms, describes the quality of the project's output vis-a-vis its adherence to original budget, schedule, and requirements.
Performance Management
The collective term for all the techniques used in managing the performance of individuals and teams involved in any project.
Performance Measurement Baseline
A combination of the budget, scope, and schedule baseline used to measure the performance of the project.
Performance Reporting
The process of reporting the project's current performance and future forecasts to relevant stakeholders.
Performing Organization
In projects involving multiple organizations, the performing organization is the organization responsible for undertaking the majority of the project's activities.
Person
Comments
Pessimistic Duration
The worst case scenario of an activity's duration, i.e. the longest amount of time it would take to finish. Pessimistic duration is used alongside Optimistic duration to get a more realistic estimate of the activity's duration.
PEST Analysis
A risk assessment technique that focuses on analyzing Political, Economic, Social, and Technological factors that might affect a project.
PESTLE
An extension of PEST analysis. Apart from Political, Economic, Social, and Technological risks, this technique also includes Legal and Environmental risks to the project, which makes it more comprehensive.
Phase
A 'phase' in project management is a large, logical subdivision of the project. 'Initiation', 'Execution', 'Planning' are examples of phases.
Phase Gate
A point at the end of a project phase where a decision about the rest of the project is taken.
Phase Reviews
The point at the end of a phase where project performance is reviewed and a decision is taken whether to proceed or not. Another term for Gate Reviews.
Physical Performance
The performance of any project work that can be physically measured, such as the number of widgets produced/hour.
Pilot
A small scale implementation of the project's end product to test its viability, capabilities, or functioning before it is fully released to end users.
Planned Activity
Any activity on the work schedule that hasn't yet started is a 'planned activity'.
Planned Cost
The total cost of the project as per the project plan. Planned Cost is also called Budgeted Cost of Work Scheduled (BCWS).
Planned Value
Also called 'budgeted cost of work scheduled' (BCWS), 'Planned Value' is the cost of all the work in the planned work schedule. This is the baseline figure against which the actual budget performance is measured.
Planning
A broad term for charting the course of any future activity in an organized manner.
Planning Phase
The phase early in the project life cycle where all project planning related activities are carried out. Everything from the communications plan to the master plan is created in this phase. At the end of the planning phase, you would ideally have a clear idea of the project's goals and how you'll go about achieving them.
Planning Poker
A technique for estimating effort required to meet project goals, typically used in software projects. The technique attempts to avoid the anchoring cognitive bias (where the first figure spoken tends to become a baseline) by forcing group members to present their estimates through numbered cards, laid face-down. Since the initial estimates are hidden, the group can arrive at an estimate that's more accurate. Sometimes, this technique is also called 'Scrum Poker'.
Play
Template activities or actions
Portfolio
The project management term for a collection of projects and programs.
Portfolio Balancing
The process of selecting and organizing an organization's portfolios so as to better divert resources to them. Portfolio balancing is used to ensure that the present state of projects in the portfolio are aligned with the broader goals of the organization.
Portfolio Charter
A portfolio charter documents the organizational structure of the portfolio, including the management team and its hierarchy, and the broader goals of the organization.
Portfolio Management
The process of organizing and managing all the portfolios spread across the organization.
Portfolio Manager
The person responsible for managing one or more portfolios and ensuring that they are aligned with the organization's objectives.
Portfolio, Program, and Project Management Maturity Model (P3M3)
A maturity model for evaluating the maturity of projects, programs, and portfolios in an organization. The more standardized and optimized each of these components are, the more mature the organization's management approach.
Positive Risk
Comments
Positive Variance
Positive Variance is the amount of time or money by which the project's performance is better than planned performance. Positive variance essentially means that the project is over-performing its budget and/or delivery estimates.
PRAM
PRAM stands for Project Risk Analysis and Management, the Association for Project Management's (APM) official guide to managing project risks.
Precedence Diagramming Method (PDM)
A technique to visualize the project's activities and the relationships between them. The end result of the Precedence Diagramming Method (PDM) is an arrow-on-activity network diagram where nodes represent activities and arrows represent the dependencies between activities.
Precedence Network
A precedence network is created as a result of the PDM (see above). This network visually represents project activities and the relationships between them.
Predecessor Activity
Any activity that logically comes immediately before the current activity.
Preventive Action
A proactive step taken to mitigate any future project risk event. Preventive action is the opposite of corrective action, in that it is proactive while the latter is reactive.
PRINCE2
PRINCE2 stands for 'Projects in Controlled Environments, version 2'. This is a project management methodology that focuses on strong upfront planning and organizing clear project roles and responsibilities. PRINCE2 advocates a more hands-off management approach where projects are managed only when necessary.
Prioritize
The formal term for organizing projects in a portfolio based on their resource requirements, objectives, financial goals, etc.
PRiSM
PRiSM stands for 'Projects Integrating Sustainable Methods'. PRiSM is a sustainability-focused project management methodology that focuses on minimizing negative impact to the environment and society as a whole. This methodology is frequently used when dealing with projects that might have an outsized negative environmental impact.
Probability and Impact Matrix
A matrix used for organizing projects risks on the probability of their occurrence and their impact on the project performance.
Problem
A problem in project management is a specific issue that must be resolved for the project to move forward. Problems are captured in problem statements.
Problem Statement
A short, succinct statement about any problem that needs to be solved. Problem statements are necessary for identifying problems are organizing efforts to resolve them.
Process
Any sequence of events with predictable inputs and outputs can be called a 'process'. Processes are repeatable and can be standardized, making them crucial for scaling any organizational effort.
Process Architecture
A collection of processes is called a 'process system'. Everything that makes up this system - activities, components, relationships, etc. - make up the process architecture. Mapping out the process architecture is usually the first step in optimizing any process system.
Process Deliverable
Comments
Process Management
The process of documenting, organizing, standardizing, and optimizing any process (or set of processes) to improve their efficiency is called 'process management'.
Procurement
Procurement is the process of acquiring services, goods, and raw materials from third party sources for use in the project.
Procurement Management Plan
A plan documenting the approach for acquiring (i.e., procuring) outside resources necessary for completing the project.
Procurement Strategy
The overall high-level strategy used for procuring goods, services, and raw materials for the organization's projects, programs, and portfolios. The purpose of the procurement strategy is to minimize waste and improve margins by leveraging the collective requirements of all the organization's undertakings. For instance, if five projects across the organization require Widget A, procuring them at the same time can cut costs instead of buying them as needed.
Product
The end result or outcome of a project. A product can be tangible or intangible. A single project can lead to one or more products at close.
Product Breakdown Structure (PBS)
A list of project deliverables, organized in a hierarchical form.
Product Description
A 'product' is any deliverable created as part of the project. A product description defines the product, its key requirements, and the goals it is meant to accomplish.
Product Life Cycle
A product-focused project life cycle that adds 'operation' and 'termination' phases to a standard linear life cycle. Since the product life cycle covers the product's operation as well, it leads to a deeper involvement from the organization in the project's long-term results.
Product Verification
The process of evaluating any product (i.e., deliverable) to ensure that it meets the requirements established in the product description.
Professional Development Unit (PDU)
One-hour blocks of time spent learning, teaching, or volunteering to ensure that project managers retain their PMI certification.
Profile of Expenditure
A forecast of the project's expenditure over time.
Program
Any set of projects managed collectively (i.e., the same team oversees multiple projects within the program).
Program Benefits Review
The stage at the end of a program where the program's performance is evaluated to see if it met its original goals.
Program Brief
A document describing the program's objectives, requirements, and the key capabilities the organization seeks to achieve through the program.
Program Charter
A formal document that identifies the team associated with the program, management hierarchies, and authorizes the use of identified resources to meet the program's goals.
Program Director
The program director is the manager responsible for the overall success of the program. Unlike the program manager, the program director oversees the program's high-level strategy and interfaces with senior stakeholders.
Program Evaluation and Review Technique (PERT)
PERT is a technique to estimate the duration of activities in any project by calculating optimistic, pessimistic, and realistic activity duration.
Program Management
The process of managing programs and aligning them with the broader goals of the organization.
Program Manager
The individual responsible for managing a program (or more rarely, multiple programs) and ensuring that they align with the organization's goals. Project managers of projects within the program report to the program manager.
Program Mandate
The program mandate outlines the core objectives of the program in terms of the new capabilities and benefits it seeks to achieve.
Progress Analysis
The process of assessing the current progress of an activity, deliverable, or overall project and evaluating it against the benchmark performance.
Progress Payments
Payments made to a third-party contractor when certain predetermined project progress goals are met. For instance, you might release 25% of the payment when 25% of the work is completed, 50% payments for 50% work completed, and so on.
Progress Reports
A report shared with senior project personnel outlining the core achievements of the project so far, the status of key deliverables, and open issues, if any.
Progressive Elaboration
Project plans are rarely, if ever, complete at project initiation. Instead, project managers regularly revisit the project plans and update them with new information as the project unfolds. This process is called 'progressive elaboration'.
Project
A project is any undertaking with specific objectives that results in a unique output. Anything can be a 'project', provided it has clear success requirements, specific resource demands, and well-defined deliverables.
Project
A project is a group of actions with a a set of constraints and goals.
Project Accounting
All financial aspects of any project fall under 'project accounting'. The goal of project accounting is to evaluate the current financial progress of the project against established benchmarks, and to take stock of all project expenses.
Project Baseline
The initial benchmark of project performance (with respect to budget and duration) established during the Initiation phase. The project baseline can be used to evaluate the performance of the project.
Project Calendar
The project calendar shows the working and nonworking time for different project tasks.
Project Champion
leader of the project: responsibilities include project updates & project success
Project Charter
A formal document that outlines the project's scope, objectives, individual roles and their hierarchies. The charter essentially gives the project manager the authority to use the organization's resources to meet the project's objectives.
Project Definition
A less frequently used term for 'Project Charter'. This document formally outlines the scope of the project, its key objectives, and all the personnel involved. The Project Definition essentially authorizes the project manager to use the organization's resources to meet the project's goals.
Project Deliverable
Comments
Project Initiation
See Initiation above.
Project Initiation Document (PID)
The Project Initiation Document is created at project initiation to outline the core requirements of the project and the initial plan. This document is used as a reference for future project planning and execution.
Project Management Body of Knowledge (PMBOK)
The official name for the collection of project management guidelines, standards, and definitions maintained by the Project Management Institute (PMI). This is the core guide to follow if you want to become a certified Project Management Professional (PMP).
Project Management Office
A dedicated department or office within an organization that deals with all project management activities. The goal of the PMO is to establish standards, track performance, and optimize processes to meet the organization's goals more efficiently.
Project Management Professional (PMP)
An official certification granted by the Project Management Institute (PMI). A PMP is often a core requirement for several formal project management jobs.
Project Management Simulators
A software program that simulates a specific type of project. The goal of the simulation is to give aspiring project managers practice on running a real world project without the risks associated with an actual project.
Project Management Software
Any software tool used in project management to make planning, scheduling, or execution easier. Project management software can range greatly in capabilities, depth, and use-cases.
Project Management Team
All personnel involved in managing the project are a part of the project management team.
Project Management Triangle
A visual tool to illustrate the constraints of project management. The three vertices of the triangle are formed by the project's scope, cost, and schedule. Changing any one of these quantities also changes the other (changing the scope, for instance, changes the cost and deadline).
Project Manager
The person responsible for planning, managing, tracking, reporting, and closing the project. Project managers have formal authority over the project (as per the Project Charter) and work with all stakeholders to ensure that the project becomes successful.
Project Network
A network diagram showing all the activities in a project and the relationships between them.
Project Office
A department or office within the organization that supports all project management efforts. These efforts can range from offering simple office support duties to high-level strategic interfacing with senior leaders.
Project Organization (Structure)
An organizational structure that prioritizes project managers over functional managers. Instead of grouping the organization's operations around functions (such as IT, Finance or Sales), a project organization organizes them around projects.
Project Performance Indicators
Key metrics used to track the project's performance. The specific metrics can vary from organization to organization and project to project. Most, however, track the project's costs and deadlines.
Project Phase
A broad but distinct stage in the project life cycle is called 'Project phase'.
Project Plan
A core document in project management that covers the project's requirements, objectives, and execution. The project plan has to be formally approved by all the stakeholders, project manager, and sponsor(s). The project plan might include domain-specific sub plans that cover areas such as communication, human resources, etc.
Project Planning (phase)
A distinct phase in the project life cycle where the project plan is finalized.
Project Portfolio Management
A portfolio management approach that aims to organize and optimize projects within a portfolio (or several portfolios) to better meet the organization's objectives. Shuffling projects between portfolios so that they can use common resources, rescheduling and reprioritizing projects, working with senior executives to meet organizational demands - all of this comes under the purview of project portfolio management (PPM).
Project Risk
Any event that can negatively affect the outcome of the project is classified as 'project risk'.
Project Risk Management
The process of evaluating potential project risks, analyzing their impact on the project, and taking corrective and preventive actions to mitigate their damage to the project.
Project Scope Management
The process of managing the project's scope and limiting unnecessary, expensive, or undesirable scope changes.
Project Scope Statement
The project scope statement outlines the core objectives and requirements of the project, including its primary deliverables. The scope statement is the project's guiding star and plays a crucial role in project planning.
Project Stakeholders
In project management terms, a stakeholder is anyone who has an interest in the outcome of the project. Stakeholders can be internal (such as the organization managing the project), external (such as a client), and third-party (such as a journalist or vendor).
Project Start Date
the date the project should begin
Project Support Experts
Any individual or group of individuals who can offer targeted expertise in specific project support activities such as cost management, budget planning, etc.
Project Team
The core team responsible for the project. The makeup of this team is highly flexible and depends entirely on the project and its scope. Large teams usually have sector specific leaders (such as 'design leader' or 'development leader'), as well as an overall 'project leader' who reports to the project manager.
Project Tiers
Tiering' is the process of segmenting projects into different categories to determine their requirements and efforts involved. Project Tiers depend entirely on the organization and its past experience running similar projects. For example, a design agency that gets a brand new project for a high-value client might label it as a 'Tier 0'. Another project that requires formulaic work for an existing small client might get a 'Tier 3' rating.
Project Variance
Any deviation from the baseline cost and/or schedule (both positive and negative) is called project variance.
Projectized Organization
A 'projectized organization' is an organization that has prioritized projects in its organizational structure. In other words, the organization's business is broken down into projects, programs, and portfolios.
Proof of Concept
A minimally functional product developed to test the viability of the project. A proof of concept is usually created to evaluate the feasibility of an idea. It can also be used to assuage an apprehensive end-user or sponsor that the project can be successful.
Proport
In project management terms, 'proport' defines the entire breadth of skills of the team involved in the project. Essentially, the 'proport' is the skills the project manager has available to meet the project's goals. If the manager requires any skills outside the proport, he/she has to acquire them from outside vendors.
Punch List
In project management terms, the punch list is all the outstanding tasks that need to be completed before the deliverables can be accepted by the end-users.
Purpose
Comments
R
RACI Chart
RACI stands for 'Responsible, Accountable, Consulted, and Informed'. A RACI chart is essentially a matrix that categorizes stakeholders based on their involvement with the project (i.e., whether they have to be responsible, accountable, consulted, or informed about an activity). RACI charts are created early in the project planning phase and play an important role in managing project communication.
RAID Log
RAID stands for 'Risks, Assumptions, Issues, and Dependencies'. In project management, a RAID log documents all issues pertaining to the above four RAID categories encountered during the project. RAID logs are maintained to develop an organization's risk register (see below) and gather data for optimizing future projects.
Rapid Application Development
A project management approach that focuses on flexible adaptive processes instead of detailed upfront planning. This approach is primarily used in software development. As an umbrella term, Rapid Application Development can refer to any number of adaptive approaches to managing projects, or it can refer to a specific variant of RAD pioneered by James Martin at IBM.
Reactive Risk Response
The action(s) to be taken in the event of a risk occurrence.
Recurring Costs
Any repetitive expenditure is dubbed a 'recurring cost'. Taking your car for annual maintenance check ups would be an example of a recurring cost.
Reduce
To reduce a risk is to take measures to either avoid its occurrence (i.e., Risk Avoidance) or to mitigate its impact (i.e., Risk Mitigation).
Reference
Comments
Relationship
In project management terms, the logical connection between two activities is called a 'relationship'.
Release
Release, in the context of software development, is a stable version of a piece of software that's available to end users.
Remaining Duration
The project management term for the time remaining in an activity.
Remote Team
Any team that does not share the same physical space and works primarily through online means is said to be a "remote team". Remote teams can be located in different office buildings in the same city, in different cities, or even in different countries.
Repeatable
Repeatable is a term used in process management to describe any process that can be 'repeated' reliably with predictable outcomes. Creating repeatable processes is crucial for scalability.
Replenishable Resource
A resource that can be replenished when needed. Replenishable resources are typically easily obtainable.
Request for Change (RFC)
A formal change request. Changes requested through a RFC are typically broad in scope and sometimes can even change the character of the project outright.
Request for Proposal (RFP)
A formal request for expression of interest from prospective sellers of goods or services. A RFP is usually the first step in establishing an agency-client relationship.
Request for Quotation (RFQ)
A followup to an RFP, a Request for Quotation is a bid document requesting cost estimations from vendors shortlisted after the RFP.
Requirement
a thing that is compulsory; a necessary condition.
Requirements
In project management terms, requirements are conditions that a deliverable must meet before it can be accepted by stakeholders. Meeting requirements is essentially the goal of any project.
Requirements Management Plan
The Requirements Management Plan documents the project's requirements and their management, monitoring, and delivery.
Requirements Traceability Matrix (RTM)
A document that helps project managers track whether the requirements are being fulfilled successfully. A RTM usually includes a detailed list of requirements, along with test cases and verification for each requirement.
Reserve
Time or money kept aside to respond to an unplanned event during the course of the project. 'Reserve' is the same as 'Contingency' (see above).
Residual Risk
Risk events that cannot be directly controlled or mitigated by the project team are classified under 'residual risk'. Residual risk is usually associated with risk events outside the scope of the project, such as global political or environmental risks.
Residual Value
The value of a resource after usage at any point of time in the project. This is an important metric to determine the financial feasibility of the project.
Resource
In project management terms, a resource is any element that's used to complete the project. In colloquial terms, however, 'resources' has typically come to stand for human resources, especially among people-driven project organizations such as agencies.
Resource Allocation
The process of allocating resources for different project activities. Resource Allocation is one of the core responsibilities of a project manager. Assigning the right resource to the right activity at the right time is instrumental in running successful projects.
Resource Availability
Whether a particular resource is available at a particular time for a particular activity.
Resource Breakdown Structure (RBS)
A breakdown of all the resources required for a project.
Resource Calendar
A calendar that tracks resource activity over a period of time.
Resource Leveling
A resource optimization technique in which activity (or overall project) start and end dates are adjusted based on the availability of resources. The goal of resource leveling is to restrict resource use to a certain 'level'. This technique is used to ensure that resources aren't spread out too thin or get burnt out through overuse.
Resource Loading Profiles
A breakdown of the resource 'loads' required at different points in the project.
Resource Management
In organizational studies, resource management is the efficient and effective development of an organization's resources when they are needed. Such resources may include the financial resources, inventory, human skills, production resources, or information technology and natural resources. Wikipedia
Resource Optimization Techniques
The collective name for all the techniques used to optimize resource use across the project life cycle. Some resource optimization techniques commonly used are Resource Smoothing and Resource Leveling.
Resource Plan
Comments
Resource Smoothing
An alternative to Resource Leveling. While Resource Leveling uses available float (which can affect the critical path), Resource Smoothing only uses free float, thus not affecting the critical path. Resource Smoothing is usually used when delivery is prioritized over resource overuse.
Resource-Limited Scheduled
A project schedule where the chief constraint is resource availability. In a resource-limited schedule, project start and end dates are modified to factor in the availability of resources (or lack thereof).
Resources
Comments
Responsibility Assignment Matrix
A chart outlining responsibilities for different activities or deliverables. Also called the 'RACI matrix'. A responsibility assignment matrix identifies the people who are responsible, accountable, consulted, or informed about a specific activity.
Retainage/Retention
Retainage or Retention is the money withheld from a contract in order to ensure smooth delivery and/or adherence to established quality criteria of the end product.
Return on Investment (ROI)
ROI is the profitability of the project, expressed in percent. A $100 project that results in $50 profit, thus, would have a ROI of 50%.
Risk
Risk, in project management, is any event that can affect the outcome of a project. This outcome can be positive or negative. Colloquially, risks that can result in a positive outcome are called 'opportunities'. Identifying, managing, and mitigating risks is one of the key responsibilities of a project manager.
Risk Acceptance
When you accept a risk and do not take any evasive measures against it, it is called 'risk acceptance'. A project manager would adopt this approach when the risk impact is minimal, or when the risk event is unavoidable.
Risk Appetite
The ability of an organization to withstand risk events is called its 'risk appetite'. An organization with high risk appetite can invest less in risk management and accept a higher number (and degree) of risks.
Risk Assessment
The process of examining different risks to a project, the likelihood of their occurring, their impact on the project, and corrective/preventive measures that can be taken against them.
Risk Avoidance
Risk Avoidance is the practice of minimizing the chances of a risk event occurring. This is different from risk management in that risk avoidance focuses largely on identifying and removing any actions or paths that can lead to a risk event.
Risk Breakdown Structure
A hierarchical breakdown of all the risks in a project.
Risk Budget
Money set side to deal with any planned or unplanned risk events. Risk Budget is part of the bigger Management or Contingency budget.
Risk Category
The segregation of risks into different categories. The exact categories will change from project to project. Common risk categories include 'Schedule', 'Cost', 'Requirements', 'Quality', 'Scope', etc.
Risk Context
The context in which a risk occurs, i.e. the relationship between the risk and the environmental, institutional, behavioral, etc. factors that affect it.
Risk Efficiency
Risk Efficiency is the concept of maximizing returns while minimizing exposure for a specific risk. Essentially, it involves taking a path that increases your returns while still exposing you to some risk. Unlike risk mitigation or avoidance, risk efficiency does not seek to prevent risk events from occurring altogether. Rather, it focuses on accepting a certain quantity of risk in order to maximize return.
Risk Enhancement
Risk Enhancement is the act of increasing the likelihood of a risk occurring. In nearly every case, you would only use this for a positive risk (i.e., an opportunity).
Risk Exploitation
Risk Exploitation is a step further from Risk Enhancement in that it focuses on ensuring that a positive risk event occurs.
Risk Identification
Risk Identification is the process of identifying and categorizing risks.
Risk Management
The part of management science that deals with risk events. Risk Management is a broad field and covers everything from risk identification to risk mitigation and avoidance. In smaller projects, risk management responsibilities are handled by the project manager. In larger projects, however, risk events would be handled by a dedicated manager.
Risk Management Plan
A risk management plan is a document that a project manager prepares to foresee risks, estimate impacts, and define responses to risks. It also contains a risk assessment matrix. A risk is "an uncertain event or condition that, if it occurs, has a positive or negative effect on a project's objectives." Wikipedia
Risk Mitigation
The process of decreasing the likelihood of a risk event occurring is called "risk mitigation".
Risk Monitoring and Control
The process of monitoring risks and using corrective/preventive measures (i.e., controlling risks) as per protocols established in the risk management plan is called Risk Monitoring and Control.
Risk Owner
Any individual in a project team who is responsible for responding to a risk event.
Risk Register
A document detailing risk events encountered during a project, the preventive/corrective measures taken, and the impact, if any. A risk register is an important document for tracking risks and planning better projects in the future.
Risk Response Planning
Once a risk is identified, possible paths to dealing with it are analyzed and formally incorporated into the risk management plan. This process is called 'risk response planning'.
Risk Sharing
The process of sharing or offloading risk to a third party, usually someone who is better equipped to deal with a specific type of risk event(s).
Risk Threshold
Risk Threshold is the point beyond which a risk event becomes debilitating and thus, warrants a response.
Risk Tolerance
An organization's Risk Tolerance defines how much of a compromise in performance or delivery timelines the organization would tolerate. This is different from Risk Appetite in that it focuses on tolerance for overall deviations from established performance standards, not openness to dealing with risk events.
Risk Transference
The process of transferring risk to a third party that is better equipped to deal with the risk event. Unlike risk sharing, where the risk is shared by both the project team and the third party, in risk transference, the risk is entirely handed over to a third party.
Risk Trigger
Any event that triggers a risk event.
Role
Comments
Rolling Wave Planning
An iterative approach to planning. Instead of planning out the entire project in detail in advance, this approach focuses on only planning near-term activities in detail. Mid and long-term activities are only broadly sketched out. In projects with changing requirements, this 'rolling' approach can be effective since it avoids overplanning of activities that might eventually change.
Root Cause
In project management terms, 'root cause' identifies the core reason for an event.
S
S-Curve Analysis
A technique to visualize the progress of a project over time. The curve usually plots cumulative work completed or costs over time. Since work completed is slow at the beginning and end of a project (i.e., when the project is being planned and closed, respectively), this curve tends to follow a shallow 'S' shape, hence the name.
Safety Plan
A plan that describes the organization's approach to minimizing damage to project resources (people or goods) from safety threats.
Sanction
Formal approval for a project or project phase to proceed with the sanctioned resources.
Scenario Planning
The process of analyzing future scenarios and developing a plan to deal with unexpected situations is called 'scenario planning'. This is essentially the process of imagining "what if?" situations and developing tactics to deal with them with available resources.
Schedule
A schedule, in project management terms, is a list of all project activities along with their start/end times.
Schedule Baseline
The schedule created during project planning. This schedule serves as a baseline for evaluating the performance of the project. If the project is progressing faster than the baseline, it would have 'Positive Variance'. Else, it would have 'Negative Variance'.
Schedule Compression Technique
two techniques used to speed up projects (primarily, Crashing and Fast Tracking) are collectively called Schedule Compression Techniques.
Schedule Network Analysis
The name for any number of techniques used to analyze network diagrams and estimate early/late start/finish dates for activities in the project.
Schedule Performance Index (SPI)
SPI is the ratio of the project's Earned Value (EV) and Planned Value (PV). If the ratio is more than one, it essentially means that the project has earned more value than the baseline, and hence, it is running ahead of schedule. A value less than one means that the project is behind schedule. SPI is a powerful metric for quickly gauging the project's schedule performance.
Schedule Variance
The difference between the Earned Value (EV) and Planned Value (PV) at any given point in the project is called 'Schedule Variance'.
Scope
Scope defines everything the project is expected to accomplish - the complete list of requirements, objectives, and outputs produced by the project.
Scope Baseline
Scope Baseline is the scope established at project initiation. This serves as the baseline to evaluate scope change and spot scope creep as the project progresses.
Scope Change Management
Changing the scope also affects practically every aspect of the project, from dependent activities to overall costs and schedules. The process of managing all these changes, as well as communicating and coordinating scope issues, comes under ‘Scope change management’.
Scope Creep
The expansion of the project scope through informal, unrecorded change requests leads to scope creep. Unlike scope change requests that are handled through formal channels, scope creep happens when the project team accepts minor changes to a deliverable. While the single change might be small, several such requests can greatly inflate the overall scope, leading to scope creep.
Scope Statement
A document that describes the project's scope, i.e., its key requirements, objectives, and output. Detailed scope statements are necessary to understand what the project is supposed to do, and, more importantly, what it's not supposed to do.
Scope Verification
The process of verifying that the project has met its scope and that all its requirements have been fulfilled.
Secondary Risk
When your response to a risk event creates a risk event of its own, it’s called a secondary risk.
Sensitivity Analysis
A method to evaluate how changing a specific model variable can change the model's output. Sensitivity Analysis is essentially a form of quantitative risk assessment that helps project managers understand which task variables (such as cost, duration, etc.) have the biggest impact on key project metrics.
Sequence
The order of occurrence of any list of activities is called a 'sequence'.
Setting
The 'setting' of a project is the relationship of the project with the organization that manages it.
Signal
Comments
Six Sigma
A collection of techniques used to minimize defects and maximize quality in process management. Six Sigma is as much a set of tools as it is a management philosophy. It is one of the most widely used approaches in industrial process management.
Slack Time
Slack Time defines how long you can delay an activity's early start without delaying the project as a whole.
Slip Chart
A type of chart used to visualize project schedule performance. The chart maps schedule 'slips', i.e., the gaps between planned and actual schedule performance.
Slippage
Slippage, in project management terms, is the delay between a project's planned vs actual schedule performance.
Social Capital
Social Capital describes the relationship between individuals, groups, and organizations. Social capital is an increasingly important quantity in project management since complex projects need the support and approval of multiple people across hierarchies in the organization.
Soft Project
A project that does not have any hard, physical end product. Most software and digital projects fall in this category.
Spiral Life Cycle
An incremental development model used primarily in software development. Projects are divided into four phases - Planning, Risk Analysis (also called 'Design'), Engineering (also called 'Construct'), and Evaluation. This model places a great deal of emphasis on risk management and is particularly viable for large projects that are vulnerable to a multitude of risk events.
Sprint
A fixed period of time during which the project goes through a complete development cycle. Sprints are used in iterative development methods such as Scrum and Agile.
Stakeholder
Any individual or organization that has an interest in the project. Stakeholders can be internal (i.e., within the project organization - such as a senior executive), external (i.e., outside the organization, such as a client), and third-party (such as a journalist or vendor). Managing stakeholders is crucial for running successful projects since stakeholders are necessary for signing off on deliverables, securing funding, and championing the project's cause.
Stakeholder Analysis
The process of analyzing the project's stakeholders, their core interests and motivations, preferred communication approach, key metrics, and impact on the project.
Start-to-Finish
A type of logical relationship between two activities. In a Start-to-Finish relationship, the successor activity cannot finish until the predecessor activity has started.
Start-to-Start
A type of logical relationship between two activities. In a Start-to-Start relationship, the successor activity cannot start until the predecessor activity has started as well.
Statement of Work (SoW)
The Statement of Work captures all the deliverables that must be created for the project to be successful, as well as their expected delivery timelines.
Status Report
A report describing the current state of the project sent to the project team and any interested stakeholders. Status reports can be one off, but are usually sent on a regular basis.
Steering Committee
A group of individuals within a project organization that offers high-level guidance on any project. That is, the committee "steers" the project in the right direction.
Subcontractor
A third-party vendor that provides goods and services to the project organization.
Success Criteria
The measures and standards a deliverable or project must meet in order to be classified as a 'success'.
Successor Activity
The activity that comes immediately after the current activity and has a logical relationship (such as Start-to-Finish or Start-to-Start) with it.
Summary Activity
When you combine related activities into a single set in a network diagram, it is called a 'summary activity'.
Sunk Cost
Resources invested in a project or activity that can't be recovered.
Super-Critical Activity
An activity with a negative float, i.e., an activity that is behind schedule, is called a 'super-critical activity'.
Supply Chain Management
The process of organizing and optimizing the supply chain of resources (typically physical but also virtual) necessary for a project.
SWOT Analysis
SWOT stands for 'Strengths, Weaknesses, Opportunities, and Threats'. SWOT analysis is used to identify potential issues (weaknesses, threats) and benefits (strengths, opportunities) that can affect a project.
Systems Development Life Cycle (SDLC)
A conceptual model used in project management for describing complex information systems. The SDLC breaks down the entire project life cycle into sequential stages - Planning, Analysis, Design, Implementation, Testing, and Maintenance. This life cycle concept is primarily used in software development and places a great deal of emphasis on testing and maintenance.